News

Campus of the future being built in Otaniemi

Start of work on the new Väre building causes changes to traffic arrangements.

The Aalto University campus in Otaniemi is currently undergoing extensive construction work. The work has begun on the new Väre building, which is located in the middle of Otaniemi, in the area between Otakaari 1 and Tietotie 1, and adjacent to the metro station under construction. 

Due to the construction work, Otaniementie will be closed to traffic between Vuorimiehentie and Tietotie as of Friday 18 December. All Otaniemi bus services will also be diverted to alternate routes beginning on 18 December. The alternate routes will remain in effect until August 2016, at which time the metro will be open for service and the Espoo bus services will be revised.

The estimated completion of the Väre building is for the summer of 2018. It will be home to the Aalto University School of Arts, Design and Architecture. The building will also house the new Aalto University Metro Centre, with its shops and services. Väre is based on the winning design submitted by Verstas Architects in an architectural design competition held in 2012–2013. The total area of the building is approximately 33 000 m2.

Väre is being built on a central area on the Otaniemi campus. This illustration depicts a view from the west in Otaniementie.

– Our aim is to make Otaniemi an attractive centre of expertise for a wide variety of actors. The campus' modern, energy-efficient and adaptable facilities provide inspiration for multidisciplinary co-operation and openness. At the same time, all our investments in the facilities are geared toward the university's efficient use of space, explains Aalto University Vice President Antti Ahlava.

– The new Väre building will not only serve the needs of the School of Arts, Design and Architecture, but also Aalto University as a whole, our partners and area residents, adds Ahlava.

Two large renovation worksites

The Aalto University Library building (Otaniementie 9) is currently undergoing an extensive renovation. Library operations have been temporarily moved to the Undergraduate Centre at Otakaari 1 X. The Learning Centre, with its entirely new operational and service concept, will open in the renovated Library building at the beginning of 2017.

The building known as Dipoli (Otakaari 24) will also be renovated. Its facilities will be updated and the purpose of the building will also change. It will be Aalto'smain building, a showcase for the university's activities, and a meeting place for personnel, students, stakeholders and visitors. The renovation will be completed in the summer of 2017.

The multidisciplinarism, which is important to Aalto University, is best realised on a joint campus. The aim of campus development is to enhance the efficiency of facilities in all university properties, thus achieving considerable savings. The main campus in Otaniemi is home to the four schools of technology, parts of the School of Business and the School of Arts, Design and Architecture. In the autumn of 2015, bachelor students at the School of Business moved to Otaniemi's recently completed Undergraduate Centre at Otakaari 1.

Read more on:

More information:

  • Aalto University Campus Development:
    Vice President Antti Ahlava, Aalto University,
    tel. +358 50 324 1179 [email protected]
  • Construction and traffic arrangements:
    Managing Director Antti Tuomela, Aalto University Campus & Real Estate,
    tel. +358 40 719 4007, [email protected]
  • Published:
  • Updated:

Read more news

Snowy trees on both sides of a snow covered foot path.
Campus Published:

Opening hours of campus buildings at the turn of the year 2023-2024

Buildings on the Otaniemi campus and in Töölö have reduced opening hours at the turn of the year 2023-24.
Gallery of photos showing children around researchers
Campus, University Published:

”What, where, why…?”- a morning spent at the Department of Applied Physics from a child’s perspective

“Bring your child to work day” 2023 took place on 24. November at the Department of Applied Physics- read what children thought of the event
Acoustics lab, robot dog Spot and Electronics ICT-lab facilities
Campus Published:

Visit School of Electrical Engineering laboratories in the spring 2024

We organise visits to the Robotics Lab, Acoustics Lab, and the Electronics-ICT laboratory.
Mikko Raskinen
Campus, University Published:

Bicycle recycling is here again!

Bicycle recycling in Otaniemi is here again! The goal is to tidy up the bicycle parking areas in the area.