News

Power outage in Otaniemi area

There was a power outage in Otaniemi area. The issue is now resolved and repaired.
Otaniemi kampus ilmakuva
Image: Mikko Raskinen / Aalto University

The issue was repaired by 10 am. There was a failure in the core network, that began at 8.50 am.

A power outage in Otaniemi area affected the following buildings: Open Innovation House (Maarintie 6), Maarintie 8, CS Building (Konemiehentie 2), Otakaari 4 (K building 1), Puumiehenkuja 3 (K building 2), Puumiehenkuja 5 (K building 3) and Sähkömiehentie 4 (K building 4).

  • Updated:
  • Published:
Share
URL copied!

Read more news

Speaker and attendees at Demo Day 2025 event
Campus Published:

A Grid in 2025: Record demand, new faces, and a calendar that brought the ecosystem together

More teams, more traction, and more touchpoints: A Grid’s 2025 affirmed Otaniemi’s place as a launchpad for ambitious founders.
Graphic illustration of distruptions in internet signal, electricity, water and other maintenance items
Campus Published:

Interruption in heat supply 4th March

Interruption in heat supply impacting following buildings: Kemistintie 1, Vuorimiehentie 1, Vuorimiehentie 2 (Bionova), Metallimiehenkuja 2, Metallimiehenkuja 4 ja Otaniementie 9 (Harald Herlin Learning Centre).
Aalto Startup Center x A Grid Demo Day 2026
Campus, Cooperation Published:

Join us for Demo Day 2026 - March 4 at A Grid

On March 4th, A Grid is the place to be because Aalto Startup Center x A Grid Demo Day will be taking place.
Cafetoria pop-up in A Bloc
Campus, Cooperation Published:

A Bloc becomes a “living lab” for Aalto students: Entrepreneurial Futures course and Cafetoria join forces in pop-up collaboration

A Bloc’s pop-up space turned into a hands-on learning environment when Entrepreneurial Futures course and Cafetoria co-created a pop-up.