News

Pricing principle for charging electric cars to change

The pricing principle for the charging of electric cars on campus will change on Friday, February 28 at 16.00 (4:00 pm). Instead of the previously used time-based charge, you will be charged based on how much energy you use.
Sähköauto Zoe

The pricing will change at the turn of February and March. In future, you will pay based on how much energy you charge instead of how long you charge your car. The new pricing principle is more equitable, as the charging power of cars no longer has any significance. The new price is €0.11/kWh.

In addition, the charging time of all the electric car charging stations was extended by one hour at the end of 2019. The new parking limitation for electric car charging stations is 3 h. Please park your vehicle at a charging station only while you are actually charging it.

On campus, there are electric car charging stations in the parking area of the Harald Herlin Learning Centre, the Dipoli parking area, behind Maarintie 8, in front of Fat Lizard and in the A Bloc parking area.

For more information on the chargers and practical charging issues, please contact Plugit, [email protected].
For more information on campus parking, please contact Aalto University Campus & Real Estate, [email protected].

 

  • Published:
  • Updated:
Share
URL copied!

Related news

Syksyinen vaahteranlehti
Campus Published:

Campus sustainability champions, urban miners and James Bond of the circular economy in Campus Sustainability Event

As part of the national Energy Awareness Week, Campus Sustainability Team arranged a Sustainable Campus Event on Wednesday 7 October 2020. The programme was very varied and full topical themes, such as urban miners and the James Bond of the circular economy. In addition, the Campus Sustainability Champion was now selected for the fourth time.
A Bloc
Campus Published:

Delivery of packages in Otaniemi transfers to A Bloc

Posti's parcel locker will start operating in K-Market Otaniemi on Monday, 12 October, and Lehtipiste's Pakettipiste parcel locker on the second floor of A Bloc in October on week 43.
Korkeakoulunaukio
Campus Published:

Otaniemi already has 1,800 metres of track

The construction of Jokeri Light Rail is under way in Otaniemi. A total of 1,800 metres of track has already been laid on Maarintie, Maarinrannatie and on Lahdenpohjanraitio next to Ring Road I.
Ostoskeskus terassi havainnekuva
Campus Published:

New terrace to be added to Otaniemi’s shopping centre

The terrace will be located at the front of the building in front of the covered corridor and will be completed on the same schedule as the rest of the renovation project in spring 2021.