News

Long live the campus! The foundation laying ceremony of Otakaari 2 celebrated the university's new buildings

The foundation of the campus' newest buildings, Otakaari 2A and 2B, was laid on 29 September 2022. The new name of the Otakaari 2A building, Marsio, a tribute to Aalto University alumna Aino Marsio-Aalto, was revealed at the event
Jukka Mäkelä ja Ilkka Niemelä
Mayor of Espoo, alumnus Jukka Mäkelä and President Ilkka Niemelä taking part of the foundation laying. Photo: Mikko Raskinen / Aalto University

The foundation of the Otakaari 2A and 2B buildings was laid at the end of September. The new name of Otakaari 2A, Marsio, honouring alumna Aino Marsio-Aalto's legacy and pioneering work in Finnish design, was revealed at the event.

'The campus is the home of a community that welcomes students, researchers, our partners and others interested in our work. The entity formed by these new buildings opens doors to the diversity of Aalto University in a completely new way, collides fields and people, connects the digital and physical worlds, is multisensory, interactive, surprising, inspiring and experiential. At the same time, it envelops cutting-edge scientific research within,' said Aalto University's President Ilkka Niemelä in the university's greeting.

Otaniemi grows and lives in time. Continuous change of the university, the development of the campus and its surrounding environment were emphasised in the greetings given in the event.

In the middle of the developing campus

'The nature of universities is to nurture development and change', described the Speaker of the Parliament Matti Vanhanen in his greeting.

With the campus's newest buildings, life, events and encounters are returning concretely to the campus after a few quieter years. Still, the coordination of digital and physical space has been taken into account even better to support hybrid working and studying.

In the construction of Otakaari 2A and 2B has been an open and seamless cooperation between the construction site and the entire Aalto community. The campus users are used to the fact that the routes change rapidly and there is a lot of construction on their way, but at the same tima are also always pleased with how the completed projects make Otaniemi an increasingly pleasant and better place.

Spaces for the School of Arts, Design and Architecture are being completed in the Marsio building, as well as for Aalto University's use as a showcase. Otakaari 2B, on the other hand, brings much-needed research and laboratory space to the most central location of the campus. This building will also be the gateway to Nanotalo. The buildings are scheduled to be completed in 2023-2024.

Builder: Aalto University Campus & Real Estate
Contractor: NCC
Designer: SARC Architects

Read more

Illustration image on a sunny day as the sun is setting, of Otakaari 2A, the lights in the building are lit and there are blurry images of people walking around. Grass and trees are green.

The new Marsio building is a showcase for research, teaching and impact at Aalto University

The name was selected through a contest, and it is a tribute to Aino Marsio-Aalto.

News
Illustration image of a spring or summer view from Otakaari towards Väre, Otakaari 2B on the right side of the image, sun is shining, there are flowers in bloom on the left of the image. Lots of people walking, cycling and interacting near the building.

Otakaari 2A and 2B construction will start 21 February

Otakaari 2A and 2B construction will start during February.

News
Illustration image depicting what Otakaari 2 could look like, people walking and cycling near Otakaari and Maarintie, man with sunglasses looks to the viewer, its sunny and there's an event in the corner of the building

Otakaari 2

Building of Marsio & 2B to began in February 2022, to be completed in 2023-2024.

Campus
  • Published:
  • Updated:
Share
URL copied!

Read more news

Aalto Acoustics Lab, image: Mikko Raskinen
Campus Published:

Visit Aalto Acoustics Lab in the spring 2023

You can book your visit via the sign-up form.
Anni Kaaria
Campus Published:

Opening hours of campus buildings at the turn of the year 2022

Buildings on Otaniemi campus and in Töölö have reduced opening hours at the turn of the year 2022-23.
White coffee cup with Space 21 logo, space's common room on the background.
Campus, University Published:

Welcome to Space 21 monthly morning coffees in Spring 2023

Space 21 open door events, monthly morning coffees, welcome all Aalto community to come and have a cup of coffee in a good company in the living room of radical creativity
Aalto logo on the snow
Campus, University Published:

Preparing for rolling blackouts at the Otaniemi campus

We aim to communicate about possible blackouts in advance