News

Aaltonians satisfied with the Kide building

According to the results of the POE survey conducted by ACRE, building users are generally satisfied with the Kide building, which was opened in January 2024.
An aerial image from early autumn of a new building soon to be finished on campus.

ACRE conducts a POE (Post Occupancy Evaluation) survey after major space changes and relocation projects. The survey examines how the current space meets various needs, such as encouraging collaboration between different units and teams or supporting more productive work. The survey is usually conducted about six months to a year after the change, and the results can be used to make any necessary corrections. The survey also includes some comparisons with the people's previous working space, i.e. whether the change was successful compared to the old one.

Kide luokkatila
Classrooms in Kide are named after Marie Sklodowska-Curie, Lise Meitner and Emmy Noether.

The POE survey of the Kide building was conducted in December 2024. According to the survey results, people are generally satisfied with the building as a whole. According to the building users, the best features of the building are good acoustics, light and the number of conference rooms. Now, meeting rooms can also be easily found for ad hoc meetings, for example. The common areas and the kitchen were perceived as attractive, comfortable and spacious places. With good common areas, communication between different teams and team members was also more efficient and easier than before.

The development targets discussed included issues such as clutter in the toilet and kitchen areas, as well as guidance on sorting waste. Bicycle storage facilities were also identified as a key development focus, in line with the broader campus initiative to improve outdoor spaces. In addition, other development ideas have been reviewed with the project team, which consists of building users and ACRE members, and solutions have been explored to address the challenges that have arisen within the building.

Kide is a research-focused building with facilities specifically for the School of Science and the School of Electrical Engineering. The building was opened in January 2024.

Aalto_University_Otakaari2B_

Kide

Konemiehentie 1

Locations
An aerial image from early autumn of a new building soon to be finished on campus.

Kide – the new name of the new building crystallises the bond between different disciplines

As a result of a naming competition, the Otakaari 2B building was given a new name

News
Students in front of School of Business

Aalto University Campus & Real Estate - ACRE

Aalto University Campus & Real Estate (ACRE) maintains, develops and rents out Aalto University facilities in Otaniemi and Töölö.

Campus
  • Updated:
  • Published:
Share
URL copied!

Read more news

Three people having a discussion at a table with laptops. Text: Visiting Professorships at TU Graz, October 1, 2026 - January 31, 2027.
Cooperation, Research & Art, Studies, University Published:

Apply Now: Unite! Visiting Professorships at TU Graz

TU Graz, Austria, invites experienced postdoctoral researchers to apply for two fully funded visiting professorships. The deadline for expressions of interest is 20 February 2026, and the positions will begin on 1 October 2026.

Cafetoria pop-up in A Bloc
Campus, Cooperation Published:

A Bloc becomes a “living lab” for Aalto students: Entrepreneurial Futures course and Cafetoria join forces in pop-up collaboration

A Bloc’s pop-up space turned into a hands-on learning environment when Entrepreneurial Futures course and Cafetoria co-created a pop-up.
Rainbow colours gradient on the left. Outi Elina Kansanen in an armchair on the right.
University Published:

Outi Elina Kansanen leaves room for imperfections

In the 100 words series, the Development Manager at the School of Electrical Engineering shares how she has promoted equality, diversity and inclusion at Aalto
People seated in rows of chairs in a room with grey walls and tiled floor, some wearing coats and jackets.
University Published:

Adaptive Reuse Seminar in Cambridge, UK

Two-day seminar in Cambridge on adaptive reuse of Downing Site, with student proposals, expert talks, and site visit.