News

Disruptions in water distribution in the Otaniemi area

HSY announced that there will be a break in the water supply
distribution in the Otaniemi area on Thu 7.11. (Maarintie 8 and Tietotie 1), Fri 8.11. (Puumiehenkuja 3 and Otakaari 4) and Wed 13.11. (Puumiehenkuja 2 and Otakaari 1).
Kampus ilmakuva Otakaari 1 Kandidaattikeskus talvi Kuva: Mikko Raskinen / Aalto-yliopisto

HSY will make the properties water pipe connections to the renewed water supply line, due to this there will be a break in the water supply distribution in the following properties:

  •  Thursday, November 7th  2019 at 08.00am – 3.00pm
    • Maarintie 8 (a water tank car will be connected to the water supply network, the break does not affect the users)
    • Tietotie 1
  • Friday, November 8th 2019 at 08.00am – 3.00pm
    • Puumiehenkuja 3
    • Otakaari 4 (a water tank car will be connected to the water supply network, the break does not affect the users)

    • A break in the water distribution may also affect Puumiehenkuja 2

  • Wednesday 13th 2019 klo 08.00am – 3.00pm
    • Puumiehenkuja 2
    • Otakaari 1 (a water tank car will be connected to the water supply network, the break does not affect the users)

The water tank car will be located in the properties were restaurants are operating.

If the work is completed sooner than planned, the water distribution may start earlier than announced.

During commissioning, deposits or rust may come loose from the pipes, which causes temporal changes to water quality, such as coloured or cloudy water. It is not harmful for your health, but this could stain the laundry and clog the tap aerators. We recommend allowing the water to run until it is colourless and clear again.

We apologize for the interruption in the water distribution.

For more information please contact HSY water supply fault number 09 1561 3000

  • Published:
  • Updated:
Share
URL copied!

Related news

Dronen ottama kuva Otakaari 1:sestä, kuva: Mikko Raskinen
Campus Published:

Blasting and excavation work on Otaniemi campus

A water supply canal will be excavated at the Jokeri Light Rail site on Otaniementie from Tuesday 26 January 2021. The excavations are expected to last until the end of week 5 (until 5 February 2021).
Small screenshot of takeout.aalto.fi
Campus, Research & Art, Studies Published:

Takeout webpage reopened for reservations

Aalto Studios and Väre Takeouts have reopened the website for reservations.
Metsähovin radiotutkimusaseman uudisosa kuva: Joni Tammi
Campus, University Published:

Metsähovi Radio Observatory renovation is complete

The renovation of Finland's only radio observatory is an investment into national astronomical research.
Konemiehentie liikennejärjestelyt
Campus Published:

Part of the Konemiehentie will be closed - traffic arrangements are changing

At the end of January, part of Konemiehentie and one lane of Sähkömiehentie will be closed. The ST1 site on Sähkömiehentie is currently being demolished.